Posted on:
Where project cargo gets moving
Not all cargo fits within the standard dimensions of a shipping container. Heavy lift and out-of-gauge (OOG) cargo require more: space, specialised equipment and a strategically located facility.
That is why Jordex Terminals in Vierpolders has a secure terminal with more than 20,000 m² of outdoor storage space, specifically designed for the storage, handling and preparation of project cargo.
The terminal's location also plays an important role. Situated just 20 kilometres from Rotterdam and the Maasvlakte and approximately 90 kilometres from the Port of Antwerp, Vierpolders forms a strategic link between two of Europe's major logistics gateways. This central location allows cargo to be efficiently received, stored and transported to its final destination.
The right equipment is available directly on site, allowing us to respond quickly and efficiently. This includes cranes, reach stackers and forklifts, as well as SPMTs (Self-Propelled Modular Transporters) for moving heavy and oversized cargo. This enables us to support projects flexibly, regardless of the size or weight of the cargo.
Whether it involves industrial components, energy projects or other specialised cargo, proper preparation often starts long before a vessel arrives or transport gets underway. With the right space, equipment and strategic location, we keep projects moving.
:quality(80))
:quality(80))
:quality(80))
:quality(80))
:quality(80))
:quality(80))
:quality(80))
:quality(80))